9H-CIO - 2013 BOMBARDIER GLOBAL 6000


    This listing is currently not for sale or available for charter


    Aircraft Summary


    General

    Year
    2013
    Manufacturer
    BOMBARDIER
    Model
    GLOBAL 6000
    Serial Number
    9535
    Registration #
    9H-CIO
    Condition
    Used
    Description
    Price reduced - One owner and one operator since new, Still under warranty until September 2019, Total Time 1634 Hours, Seating capacity : 13 pax, EU-OPS compliant for commercial operations, CAMP program

    Airframe

    Total Time
    1819.0

    Engine Program

    Engine Program Notes
    Engine Model: BD-700-1A10 Engine 1 S/N: 22197 TSN/CSN: 1634 hrs. /400 cycl. Engine 2 S/N: 22196 TSN/CSN: 1634 hrs. /400 cycl. APU APU Model: RE-220GX APU S/N / Part: P-664 TSN: 1137 hrs.

    Avionics

    Avionics/Radios
    • Rockwell Collins Fusion – 4 Adaptive Flight Display, 15.1”. • Synthetic Vision with integrated HUD. • Dual Radio-altimeter. • MultiScanTM Weather Radar, 18”. • Lightning Detection System (LDS). • Swift Broadband (SBB) SATCOM transceiver (SAT-2200), one (1) channel (Aero H+) for voice and data transmission up to 432 kbps and one (1) maintenance channel with ACARS comm. • Iridium Telephone System with Aerocom 3000 CTU • TSS TCAS & Transponder (TCAS Version 7.1), ADS-B out & EHS compliant. • 3rd. FMS. • Enhanced Vision System (EVS). • Dual HF system. 3rd. VHF COM, Data Link. • Quick Access Recorder (QAR). • Wireless Cockpit Printer. • Dual 8.4” Multifunctional Touch-screen Display EFB Class 2. • PMAT (Portable Maintenance Access Terminal). • Airshow ASXi Interactive Flight Information System with seven (7) presentations. • Securaplane InFlight Camera System. • Emergency Vision Assurance System (EVAS) • 115 VAC cabin electrical universal outlets on the entire Aircraft, provided by a dedicated 3500 VA / 115V AC / 60 Hz Power Converter

    Exterior

    Exterior Notes
    Overall Matterhorn White w/ Blue and Yellow Stripes

    Interior

    Interior Notes
    The aircraft has 13 seats TTOL Aircraft entrance • Galley area with one (1) 10.6” touch-screen HD monitor, TIA high temperature oven, Microwave oven, Aerolux (Nespresso) manual fills expresso coffee maker, 115VAC power outlets, sink with hot and cold water, storage boxes for drinks, pull-out work surface locking at three (3) Positions, ice storage, thermos storage, galley control panel and trash container • Lavatory incorporating toilet, sink with hot and cold water and 115VAC power outlets. • Crew Rest Compartment on L/H side at the entrance area • Floor mat heaters at Entrance Area Main VIP cabin • Four forward executive club seats with foldout tables • 3-place Fully Berthable divan opposite club-4 executive seats with high-low Conference Table with plug-in extension. • Mid and Aft Cabin divided by an electric pocket door. Aft VIP cabin •one 3 place divan (2 seats for take-off and landing) on the left hand side and one single club seat on the right hand side • Aft VIP lavatory incorporating toilet, sink with hot and cold water and 115VAC power outlets. Cabin entertainment and connectivity • Global Office installed (SATCOM SBB, Iridium and AeroH+) providing Cockpit and Cabin Internet Connectivity through LAN and WIFI. • Cabin Entertainment System (CES): four (4) 24" LCD monitors installed, two (2) dual Blu-Ray DVD players providing four (4) simultaneous independent operations, eighteen (18) headsets, ten (10) speakers and four (4) subwoofers and nine (9) receptacles for 10.6” plug-in touchscreen HD monitors and integrated iPod cradles in the cabin sideleges Miscellaneous equipment • Addition of Refuel/Defuel Control Panel. • Towar Assembly storage in the aft equipment bay. • Aft Equipment Bay Storage Box. • Catwalk Battery Access. • Handrail Extension. • Common Key Panels of the external doors. • Multi-Purpose Ladder. • External Service Door Hold-Open Feature •External Baggage Door Lock Override • EICAS Door Open “SMAL SERV DOOR” Annunciation.

    Inspection Status

    Inspection Status
    The aircraft is maintained EASA EU OPS. Refer to CAMP report for detailed information Last maintenance check performed in February 2016 (including 500 FH Check, 750 FH Check, 1500 FH Check, 15 Months Check, 30 Months Check) Due checks: 500 FH check end November 2016 Refer to CAMP report


    Click Here to find your Operating Cost


    Aircraft.com does not own the rights to the images displayed on this site. We do not have information regarding the original seller or source of these images unless explicitly stated.