N443EA - 1996 CESSNA CITATION V ULTRA




    Aircraft Summary


    General

    Year
    1996
    Manufacturer
    CESSNA
    Model
    CITATION V ULTRA
    Serial Number
    560-0400
    Registration #
    N443EA
    Condition
    Used
    Description
    Engines (L) "0" Hours SHSI / (R) 168 Hours SOH. Fresh Phase 1-4 c/w February 2026. 2024 Interior Refurb. New Main Gear Actuators. Call to Inquire!

    Airframe

    Total Time
    8944.1
    Total Landings
    8127

    Engine Program

    Engine Maintenance Program
    None

    Engine 1

    Engine 1 Manufacturer
    PRATT & WHITNEY
    Engine 1 Model
    JT15D-5D
    Engine 1 Time
    1715.5
    Engine 1 Time Since
    SOH
    Engine 1 TBO
    3500
    Engine 1 Time Since HSI/MPI/Mid-Life
    0
    Engine 1 Notes
    0 Hours SHSI

    Engine 2

    Engine 2 Manufacturer
    PRATT & WHITNEY
    Engine 2 Model
    JT15D-5D
    Engine 2 Time
    168.5
    Engine 2 Time Since
    SOH

    Avionics

    ADS-B Equipped
    Yes
    WAAS
    Yes
    Avionics/Radios
    Honeywell Primus 1000 –Tube EFIS Dual Collins VHF-22A Comms Dual Collins VIR-32 Navs Collins ADF-462 ADF Fairchild A2005 CVR Collins DME-442 Artex C406-2 ELT Honeywell Primus 650 Radar ALT-55B Radar Altimeter Dual Mode S Collins TDR-94 Transponders AlliedSignal MK-VI EGPWS Bendix/King CAS-67A TCAS Universal UNS-1ESPW WX-1000E Stormscope

    Additional Equipment

    Additional Equipment
    Pilot & copilot Dual USB Ports Single Point Refueling Cockpit Speaker Mute Switch Sealed Lead Acid Battery Vapor Cycles Air Conditioning

    Exterior

    Year Painted
    2017
    Exterior Notes
    Overall White with Black and Silver accents.

    Interior

    Year Interior
    2024
    Interior Notes
    Seven passenger executive interior is a center club configuration with two forward aft-facing seats and aft belted lavatory seat. Additional cabin amenities include forward left deluxe refreshment center, dual executive writing tables in center club setting. *Refurbishment includes new carpet and wall coverings, reconditioned luxury leather seats and cockpit side panel leather

    Inspection Status

    Inspection Status
    Phase 1-4 Completed February 2026 Phase 5 Due December 2026 New Main Gear Actuators


    Click Here to find your Operating Cost


    Aircraft.com does not own the rights to the images displayed on this site. We do not have information regarding the original seller or source of these images unless explicitly stated.