2002 HAWKER 800XP
Aircraft Summary
General
Year
2002
Manufacturer
HAWKER
Model
800XP
Condition
Used
Description
A highly maintained Hawker 800XP combining the cabin comfort and ramp presence of the classic midsize Hawker with a strong 2026 maintenance position, updated cabin amenities, and comprehensive engine and avionics program coverage.
Airframe
Total Time
6496.8
Total Landings
5064
Engine Program
Engine Maintenance Program
MSP Gold
Engine Program Notes
LEFT ENGINE: 6,368.4 Hours / 4,873 Cycles
RIGHT ENGINE: 6,447.8 Hours / 4,999 Cycles
ENGINE PROGRAM: Honeywell MSP Gold
ENGINE MODEL: Honeywell TFE731-5BR-1H
Engine 1
Engine 1 Manufacturer
HONEYWELL
Engine 1 Model
TFE731-5BR-1H
Engine 1 Time
6368.4
Engine 1 Time Since
SNEW
Engine 1 TBO
5000
Engine 2
Engine 2 Manufacturer
HONEYWELL
Engine 2 Model
TFE731-5BR-1H
Engine 2 Time
6447.8
Engine 2 Time Since
SNEW
Engine 2 TBO
5000
Avionics
Avionics/Radios
-Rockwell Collins Pro Line 21
-Dual Collins VHF-422C communications
-Dual Collins ADF-462
-Collins 6200 CDUs
-Dual Collins DBU-5000 FMS
--Collins ALT-4000 radio altimeter
-Universal CVR-120 cockpit voice recorder
-Automatic Flight Guidance System (AFGS-3000)
-Dual Collins VIR-432 navigation receivers
-Dual Collins DME-442
-Dual TDR-94D Mode S transponders
-Collins TRW-850 weather radar
-Dual HF communications with SELCAL
-Honeywell Mark V EGPWS
-Honeywell AFIS (VHF/SAT)
-WAAS / LPV
-ADS-B Out
-RVSM
-TCAS 7.1
-Artex C406-2 ELT
Interior
Interior Notes
Eight-passenger executive configuration featuring a forward four-place club, a three-place divan, one forward-facing executive seat, and a
certified jumpseat as the eighth passenger position. Recent interior soft goods refurbishment creates a clean, comfortable and market-ready
cabin.
CABIN AMENITIES:
-ALTO Aviation premium Bluetooth cabin audio system
-Aircell Axxess satphone - cabin and cockpit handsets
-Magnastar C-2000 flight phone
-Airshow 410 cabin briefer
-115V cabin and cockpit power outlets
Inspection Status
Inspection Status
-Fresh MPI on both Honeywell engines
-Landing gear overhaul completed March 2026
-96-month center fuselage structural inspections / NDT
-Horizontal and vertical stabilizer inspections / NDT and X-ray
-Wing front spar and internal wing structure inspections
-Nose landing gear bay sidewall inspection / NDT
-Flap synchro cable replacement
-PRELIMINARY SPECIFICATION
-Center fuselage X-ray inspections
-Front pressure bulkhead detailed inspection
-Escape hatch and rudder hinge bracket inspections
-Pressure maintaining valve overhaul
-Main landing gear door jack overhauls
-Additional CAMP due-list work prior to sale
-Current maintenance items addressed before delivery
Recommended For You
View All(Recommended For You)Aircraft.com does not own the rights to the images displayed on this site. We do not have information regarding the original seller or source of these images unless explicitly stated.


